Interior design and renovation costs = design fee + construction fees for each work item (unit price × quantity) + equipment and building material fees + supervision/management fees. Design fees are commonly priced per ping, as a percentage of the construction fee, or as a total project price; construction fees are calculated item by item according to demolition, plumbing and electrical work, masonry, carpentry, painting, and so on. Payment is usually made in installments by progress, and the Ministry of the Interior's "Building Interior Renovation — Design Commission and Construction Contract Template" sets a cap for each installment: the signing payment may not exceed 5% of the total contract price, the commencement payment 5%, the completion and cleaning stage 30%, and the balance is settled after acceptance inspection passes and the interior renovation completion certificate is obtained. The following is a neutral summary; actual amounts are subject to the written estimate and contract.

Ministry of the Interior "Building Interior Decoration - Design Commission and Construction Contracting Contract Model" ↗

What Items Make Up Interior Renovation Costs? How Are Trades Generally Broken Down?

The total renovation price is not a single figure but the sum of design, various trade works, equipment and materials, and management. Understanding the components allows for item-by-item comparison rather than just looking at the total. The table below shows common cost categories and their contents.

Cost CategoryMain Contents
Design FeeMeasurement, layout planning, construction drawings, material selection advice (pricing methods detailed in next section)
Demolition and DisposalRemoval of existing finishes, waste disposal (typically higher proportion for older homes)
Plumbing and ElectricalWater supply and drainage, wiring, low-voltage systems, switch and outlet layout
Masonry WorkWall construction, plastering, waterproofing, tiling
Cabinetry / Custom CabinetsCeilings, cabinets, partitions, storage
PaintingSpackling, primer, topcoat
Equipment and MaterialsAir conditioning, flooring, doors and windows, bathroom fixtures, kitchen cabinets, lighting, etc.
Management / Supervision FeeSite management, coordination, supervision, cleaning (often a percentage of construction cost)

Amounts for each item vary by square footage, property condition, and material grade. It is recommended to obtain itemized quotes. This page provides neutral information.

What Are Common Pricing Models for Design Fees? Can They Be Applied Toward Construction Costs?

Design fee pricing methods vary by provider. Common models include:

  • Per Square Foot Pricing: Based on interior square footage multiplied by a per-square-foot design fee, varying with size and complexity.
  • Percentage of Construction Cost: A certain percentage of the total construction cost as the design fee; larger projects typically mean higher design fees.
  • Fixed Project Fee: A lump sum design fee based on the project scope, suitable for well-defined projects.

Additionally, some providers allow design fees to be partially applied toward construction costs (i.e., deducted when using the same provider for construction), while others keep design and construction separate. Whether it can be applied, how much, and whether it includes subsequent supervision varies. It is recommended to confirm in writing before signing a contract.

Pricing models and applicability depend on each provider's policies, project specifics, square footage, and service scope. This page provides neutral information.

How should the per-stage payment caps be read? The tiers in the Ministry of the Interior's contract template.

“How fees are calculated” is not only about how the total price is broken down; the other half is when to pay and how much each installment is. The Ministry of the Interior has a contract template for interior renovation (amended by announcement Tai-Nei-Ying-Zi No. 1030813951 on December 9, 2014), which sets upper-limit percentages for each installment and can serve as a benchmark for comparing one’s own quote and contract. The template is a reference version provided by the authorities and is not mandatory, but if a contractor requests an initial payment far higher than the table below, it is worth asking them to explain the reason and state it in the contract.

Payment timingDesign Commission and Construction Contract (design + construction)Design Commission Contract (design only)
Date of signingMust not exceed 5% of the total contract priceMust not exceed 10% of the total contract price
Commencement / completion of stages 1 and 25% on the commencement date5%
Construction milestone 3 / completion of stage 325%30%
Construction milestone 4 / completion of stage 425%30%
Completion cleaning / obtaining the interior renovation permit documents on behalf30%10%
Final settlementFinal settlement after all construction has passed acceptance inspection and the interior renovation compliance certificate has been obtained; for a design-only case, the remaining balance is settled when more than 6 months have passed after obtaining the permit documents without the project being put out to contract, or upon completion of performance.

The same template also contains three payment-related provisions that can be checked together before signing: the right to take the contract away and review it—the contract and notes on signing are taken home by the owner for review, and the review period must be at least 7 days; payment request period and late interest—the owner shall pay within a certain number of days from receipt of the payment request (not less than 7 days), and in case of delay the maximum interest is 5% per annum; warranty retention bond—after acceptance inspection is completed and the compliance certificate is obtained, the contractor shall provide it, the amount must not be less than 5% of the total contract price, and after the warranty obligation is released, the owner shall return it without interest.

The above percentages are the per-installment caps stated in the template, not market rates or recommendations of this site; the contract actually signed by both parties shall prevail. The full text of the template is provided under “Further References” at the bottom of this page. This paragraph is a neutral information summary and not legal advice.

Why Do Quotes from Different Providers Vary So Much for the Same Project?

Quote differences often reflect differences in content rather than quality ranking. Common factors causing variation include:

  • Material Grade: Different brands and models of panels, tiles, equipment, etc., can lead to significant price differences.
  • Methods and Processes: Whether basic work like waterproofing, structural reinforcement, and hidden pipe replacement is included.
  • Scope of Work: Whether the quote includes demolition and disposal, protection work, waste removal, and coordination between trades.
  • Inclusion of Design and Supervision: Low total prices sometimes exclude design fees or on-site supervision; item-by-item comparison is needed.

Therefore, when comparing quotes, it is advisable to align each provider's items, quantities, unit prices, and material specifications to ensure a consistent basis for comparison, avoiding vague terms like "equivalent grade" or "lump sum."

Quote differences reflect variations in service and material content, not quality rankings. Actual terms are based on formal quotes and contracts.

What Do Supervision and Management Fees Cover? How to Understand Them in a Quote?

Supervision and management fees are often combined or omitted but directly affect on-site quality and progress. They generally cover: site management, coordination of trade schedules, on-site supervision and inspection, safety and cleanliness maintenance. They are commonly listed as a percentage of the total construction cost.

In a quote, note:

  • Whether the management fee is listed separately or included in individual item unit prices.
  • The frequency and form of supervision (regular site visits, progress reports or photos).
  • Clear responsibility for coordination and finishing between trades.

The scope and percentage of management fees vary by project and provider. It is recommended to confirm and include them in the contract before signing. This page provides neutral information.

Step One Today: How to Obtain Comparable Renovation Quotes

Renovation costs are hard to compare, often due to inconsistent detail in estimates. To make inquiries comparable, start with these steps:

  1. Define the scope first: Square footage, property condition, and desired work items (demolition, plumbing, masonry, carpentry, etc.) form the basis of a quote.
  2. Request an itemized estimate: Ask contractors to list each work item's product name and specifications, unit, quantity, unit price, and subtotal, clearly indicating whether labor and materials are included, rather than providing only a total price (see our guide on how to read an estimate).
  3. Compare the same work items: When comparing 2 to 3 contractors, compare item by item for identical work items and material grades. An unusually low total price often indicates omitted items or downgraded specifications.

One thing you can do today: List your property's square footage and desired work items, request an itemized estimate from contractors instead of a verbal total price, and confirm whether the contractor is registered for interior decoration work (see our guide on how to verify legal registration). Actual costs depend on the specific case, based on written estimates and on-site measurements.

This section provides neutral information and does not rate or recommend specific contractors' prices.

FAQ

What items are included in interior renovation costs?

Generally includes design fees (or measurement, planning, drawings), construction fees for various trades (demolition, plumbing, masonry, cabinetry, painting, etc.), equipment and material costs, and supervision or management fees. Each item depends on the project; it is recommended to obtain itemized quotes.

How are design fees calculated?

Commonly priced per square foot or as a fixed project fee, influenced by complexity and service scope. Whether combined with construction or applicable toward construction costs varies by provider; confirm before signing.

Why do quotes from different providers vary so much?

Differences arise from material grade, methods, scope of work, and service content. Quote differences reflect content variations, not quality rankings. It is recommended to compare itemized quotes rather than just the total.

Must interior design fees and construction fees be calculated separately?

Design and construction fees are usually calculated separately, but some providers combine them. It is recommended to request itemized details for clarity. This page provides neutral information.

What are the main differences in cost structure between old house renovation and new home decoration?

Old house renovation often requires additional expenses for plumbing and electrical updates, structural reinforcement, demolition, and waste disposal, typically resulting in a higher overall budget and more complex work. It is advisable to set aside a contingency fund.

What items are typically included in the management fee for renovation work?

Management fees generally cover site management, supervision, coordination, and cleaning; a common industry range is approximately 3% to 15% of the total construction cost (varying by case complexity, project duration, and service scope, with different vendors using different pricing methods). Specific items and percentages should be stated in the contract, and it is recommended to confirm the scope before signing; this page provides neutral information.

What cost pitfalls should be noted when selecting material grades?

Different material grades have large price differences. Quotes should clearly specify brand, model, and specifications to avoid vague terms like "equivalent grade" that may lead to additional charges for material changes. This page provides neutral information.

What are common payment methods in renovation contracts?

Payments are commonly made in installments according to construction progress. The Ministry of the Interior's Building Interior Renovation—Design Commission and Construction Contract Template sets caps for each stage: the signing payment may not exceed 5% of the total contract price, the commencement payment 5%, each construction milestone 25%, and the completion and cleaning stage 30%; the final payment is settled after all acceptance inspections are completed and the interior renovation compliance certificate is obtained. The template for design-only commissions provides for 10% at signing, 5% and 30% for phased drawings, 30%, and 10% for obtaining interior renovation permit documents on behalf. The template is a reference version provided by the authorities and is not mandatory; actual terms are governed by the contract signed by both parties. This page is a neutral compilation of information.

How should homeowners handle budget overruns?

Any additional items should first have a written quotation and the owner's written consent before construction begins. The Ministry of the Interior's contract template sets out a comparable principle in this regard: actual construction costs should in principle not exceed 20% of the initially estimated construction cost; if they do exceed it and the owner does not agree, the contractor should adjust the detailed design. Payment of increases or decreases in the construction amount is to be governed by a payment schedule separately agreed by both parties. It is advisable to expressly provide in the contract for the additional-work review process and cap, and to retain a contingency fund; this page is a neutral compilation of information.

How much deposit is reasonable to pay upfront when signing the contract?

You can use the caps in the official templates as a reference: under the Ministry of the Interior’s Building Interior Renovation—Design Commission and Construction Contract Template, the signing payment paid on the signing date may not exceed 5% of the total contract price; for the design-only Design Commission Contract Template, the signing payment may not exceed 10% of the total contract price. The templates are not mandatory rules, but if a contractor asks for an upfront payment far above these percentages, it is worth asking them to explain why and to state it in the contract. This page is neutral information and not legal advice.

Can I take the renovation contract home to review it first? How many days do I have to review it?

Yes. The first page of the Ministry of the Interior's interior renovation contract template contains the "right to review the contract," stating that the contract and signing notes are to be taken home by the owner for review, and the review period is at least 7 days. Also, according to the template, the owner shall make payment within a certain number of days from the date of receiving the contractor's payment request (no less than 7 days), and the upper limit for interest in case of delay is an annual interest rate of 5%. This page is a neutral compilation of information and not legal advice.

What is a warranty/retention bond? How much must be paid, and when is it refunded?

Under the Ministry of the Interior's Building Interior Renovation—Design Commissioning and Construction Contract Template, after all works have been inspected and accepted and an interior renovation compliance certificate has been obtained, the contractor provides a warranty bond as warranty security, in an amount not less than 5% of the total contract price. It may be provided in forms such as bearer negotiable time deposit certificates, bank promissory notes, certified checks, or bearer government bonds; after the warranty obligations are discharged and there are no outstanding matters, the owner shall return it to the contractor without interest. Note that this money is security provided by the contractor to the owner, not an additional fee paid by the owner. This page is a neutral compilation of information and does not constitute legal advice.

References (official data sources)

· This page is a neutral compilation of information for reference only. Please refer to the announcements of the competent authority for actual registration status and regulations.