What's the difference between design, turnkey, and contractors?

Three common ways to carry out interior renovation: design, where a designer or firm handles planning and drawings; design-and-build (turnkey), where one firm integrates design and construction; and independent trade crew, which handles construction only. Under Article 5 of Taiwan's Regulations Governing Interior Renovation of Buildings, a practicing licensed architect may perform design, a licensed construction contractor may perform construction, and a registered interior renovation firm may perform design or construction according to its registration; Article 10 provides that a registered interior renovation firm must obtain a registration certificate from Taiwan's Ministry of the Interior before conducting business. The following is neutral information and does not compare or rank businesses.

Building Interior Decoration Management Regulations (National Laws and Regulations Database) ↗

What are the specific differences between design, turnkey, and contractors in terms of 'service scope and responsibilities'?

The core difference among the three methods lies in who is responsible for 'planning', 'execution', and 'integration'. The table below compares service scope, deliverables, supervision responsibility, and single point of contact for easy clarification.

AspectDesign (Designer/Firm)Turnkey (Design + Construction)Contractors (Single or multiple trades)
Main tasksSpace planning, floor plans, construction drawings, material selection adviceIntegrated service from drawings to constructionOn-site execution per trade (e.g., electrical, plumbing, tiling, carpentry)
DeliverablesDesign drawings, construction drawings, material scheduleDrawings + project quotation + construction scheduleMostly trade-specific quotations, may not include drawings
Supervision/CoordinationMay be billed separately per contract, or only design supervisionTurnkey contractor coordinates sequencing of all tradesMostly coordinated by the owner
Point of contactSingle for design, but construction requires separate contractingSingle point of contact, centralized responsibilityMultiple contacts; owner acts as general coordinator

The above is a neutral comparison of the three methods. Actual services, including supervision and drawings, depend on the contract with each provider.

What is the legal status of designers, design-and-build firms and trade crews under the regulations? The practitioners and registration rules in Taiwan's Regulations Governing Interior Renovation of Buildings

Design, design-and-build and trade crew are market terms; the regulations use the term interior renovation practitioners. The following summarizes the provisions in Taiwan's Regulations Governing Interior Renovation of Buildings, amended on 11 December 2023, that relate directly to these three ways of carrying out work:

ArticleProvisionMeaning for designers, design-and-build firms and trade crews
Article 3Interior renovation means ceilings, interior wall surfaces, fixed screen partitions higher than 1.2 meters above the floor or screen partitions that also serve as cabinets, and changes to partition walls that are fixed to the building structure; the pasting and placement of wallpaper, wall fabric, curtains, furniture, movable screen partitions, carpets and similar items do not countReplacing only wallpaper, curtains or movable furniture is not interior renovation under these regulations
Articles 4 and 5Interior renovation practitioners are practicing licensed architects, licensed construction contractors and registered interior renovation firms: architects may perform design, construction contractors may perform construction, and registered interior renovation firms may perform design or constructionFor design, one may engage an architect or a registered interior renovation firm registered for design services; for construction, one may engage a licensed construction contractor or a registered interior renovation firm registered for construction services
Article 9A registered interior renovation firm must employ full-time technicians according to the scope of its business: design services require at least 1 registered professional design technician, construction services require at least 1 registered professional construction technician, and a firm doing both must have both types of personnel; the company or business name must include the words interior renovationThe registration of a design-and-build (turnkey) firm that does both design and construction should cover both design and construction
Articles 10 and 11A registered interior renovation firm must apply to Taiwan's Ministry of the Interior for registration and obtain a registration certificate; a firm that has not obtained one may not conduct interior renovation business; a registration certificate is valid for 5 years, and a firm may not conduct business after expiry without renewalBefore signing a contract, check the registration certificate, registered scope and expiry date (see How to Check Whether a Business Is Legally Registered on this site)
Article 25Interior renovation drawings and specifications must be signed by and be the responsibility of a practicing licensed architect or registered professional design technician; where a review agency determines that a change to a partition wall involves public safety, it must be certified by a practicing licensed architectFor cases requiring review, drawings and specifications must be signed by qualified personnel

Article 2 provides that these regulations apply to buildings for public use and to non-public-use buildings that Taiwan's Ministry of the Interior determines are necessary; Article 22 provides that interior renovation of these buildings requires prior application for review of drawings and specifications and a permit before construction (see Interior Renovation Review on this site for whether review is required). The regulations have no statutory category for design-and-build or trade crew, and do not set a warranty period; warranty terms are governed by the contract between the parties. This section is based on the current provisions in Taiwan's Laws and Regulations Database and is not legal advice.

When hiring a designer, turnkey contractor, or individual trades, who is responsible for integration and supervision?

Integration and supervision are key to renovation quality and schedule. Responsibilities vary by method.

  • Hiring a designer (design and construction separate): The designer typically handles design supervision (ensuring construction matches drawings), but actual scheduling of trades, sequencing, and cross-trade coordination may fall to the owner or a separately hired construction manager.
  • Hiring a turnkey contractor: The turnkey contractor serves as a single point of contact, coordinating design, trade scheduling, and on-site supervision. The owner has less coordination burden but should verify that supervision is actually provided and progress reports are given.
  • Self-contracting trades: The owner acts as the general coordinator, arranging the sequence and handoffs of demolition, electrical, plumbing, carpentry, painting, etc., and must be on-site to check quality. This offers flexibility but requires more time and expertise.

Supervision methods and responsibilities should be confirmed and written into the contract before signing. This page provides neutral information.

What should be noted about contracts and payment structures for the three methods?

Different methods have different contract forms and payment milestones. It is advisable to clarify each item before signing.

  • Design contract: Typically based on design fees, specifying deliverables (drawings), number of revisions, whether supervision is included, and whether design fees can be offset against construction costs.
  • Turnkey contract: Design fees and construction costs should be itemized separately, with payment milestones tied to project progress (signing, start, each trade commencement, completion inspection). Avoid paying a high percentage upfront.
  • Trade quotations: Usually priced per work item. It is recommended to request itemized quantities, unit prices, and material specifications, and to agree on responsibility boundaries between trades in advance to avoid disputes.

Regardless of the method, payment schedules, warranty scope, and change order procedures should be clearly written into the contract. This page provides neutral information and does not constitute legal advice.

How to determine which method suits you based on budget, time, and involvement?

There is no absolute best method; the difference lies in who handles coordination and how much time and expertise you are willing to invest. Consider the following aspects:

  1. Time and effort: If you can frequently visit the site and coordinate, self-contracting offers flexibility; if time is limited, a turnkey contractor's single point of contact reduces coordination burden.
  2. Design needs: If you have high requirements for space planning and overall style, design or turnkey can provide comprehensive drawings; for basic renovations, directly hiring trades may suffice.
  3. Clarity of responsibility: If you prefer a single responsible party when issues arise, turnkey offers centralized accountability; self-contracting requires you to define each trade's responsibility.

The suitable method depends on individual needs and conditions. This site does not rank or recommend any method or provider.

FAQ

How to distinguish between design, turnkey, and contractors?

Design focuses on space planning and drawings; contractors handle on-site construction; turnkey integrates design and construction under one provider. Providers registered for 'design and construction' can typically offer turnkey services, but actual services depend on the contract.

Is it better to hire a turnkey contractor or separate design and construction?

Turnkey offers a single point of contact and centralized responsibility; separate contracting offers more flexibility but requires self-coordination. The suitable choice depends on budget, time, and involvement. This site does not make comparisons.

What does the registration scope 'design, construction' mean?

It indicates that the provider's interior decoration business registration covers both design and construction. This site displays the official registration scope on provider pages. Actual services should be confirmed with the provider and contract.

How do fee structures differ among design, turnkey, and contractors?

Design fees are usually based on area or a percentage of construction cost; turnkey fees include design and construction management; contractors charge per work item, excluding design and supervision. It is recommended to obtain itemized written quotations for comparison. This page provides neutral information.

What is the biggest process difference when choosing a designer, turnkey contractor, or trades?

With a designer, you need to separately contract construction; turnkey provides a single point for design and construction; with trades, you must plan and coordinate yourself. Each has pros and cons; choose based on your time and ability. This site does not make comparisons.

What registrations are required by law for design, turnkey, and contractors?

Under Articles 4 and 5 of Taiwan's Regulations Governing Interior Renovation of Buildings, interior renovation practitioners are practicing licensed architects, who may perform design, licensed construction contractors, who may perform construction, and registered interior renovation firms, which may perform design or construction according to their registration. Under Article 9, a registered interior renovation firm must employ registered professional design or registered professional construction technicians according to its business, and under Article 10 it must obtain a registration certificate from Taiwan's Ministry of the Interior before conducting business; a registration certificate is valid for 5 years (Article 11). The regulations have no statutory category for design-and-build firms or trade crews. This page provides neutral information.

If I want to self-contract trades, how can I ensure construction quality?

It is recommended to specify material brands, models, and construction standards in the contract, and to visit the site regularly. Self-contracting requires coordinating trades yourself; fully understand the process before deciding. This page provides neutral information.

What are the differences in warranty scope among design, turnkey, and contractors?

The Regulations Governing Interior Renovation of Buildings do not set a warranty period. Whether one engages a designer, a design-and-build firm or a trade crew, the scope, duration and responsibility for warranty are governed by the contract between the parties. In general, design contracts mainly cover drawings and design supervision, design-and-build contracts cover design and construction, and trade crews cover the work items they perform. It is advisable to write the warranty items, start date and duration into the contract when signing. This page provides neutral information.

How is liability divided in case of renovation disputes among design, turnkey, and contractors?

Designers are liable for drawing defects; turnkey contractors bear overall responsibility; trades are liable only for construction defects. It is recommended to clearly define responsibilities in the contract and keep written records. For legal disputes, consult a professional.

Can a trade crew construct without an interior renovation registration certificate?

It depends on whether the building falls within the scope of the regulations. Article 2 of Taiwan's Regulations Governing Interior Renovation of Buildings provides that the regulations apply to buildings for public use and to non-public-use buildings that Taiwan's Ministry of the Interior determines are necessary. Within that scope, Article 10 provides that a registered interior renovation firm may not conduct interior renovation business without a registration certificate, and construction may also be carried out by a legally registered licensed construction contractor (Article 5). Replacing only wallpaper, curtains or movable furniture does not count as interior renovation (Article 3). Whether the regulations apply can be confirmed with the local building authority.